Always on tasks are stuck on "preparing to start" after scheduled downtime.

Greetings, I have two always-on tasks on your server. And I am aware that there was a planned shutdown at 07:00 UTC and the shutdown was planned to stay around 30 minutes. But, my tasks are stuck on "Preparing to start" still. What am I supposed to do to restart the task, because all the buttons except the "log" button are disabled?

The code doesn't have an error because when I run it on the console manually it works perfectly. Please help me solve this issue as soon as possible. Thanks.

don't know if my email or the forum helped, but now it has started working. Thanks.

Sorry for not posting back here sooner! Yes, we did have an issue with some scheduled tasks after the system update. All should be well now.